Read more

Modifying the Pipe Gap in Plant 3D 2014

The first thing I noticed when I placed a pipe gap in 2014 is that there was no hatch on the closed part of the gap.  In the companies I’ve worked, the standard gap always include a solid hatch.   Much like the isometric organization, the orthographic drawings have a drawing that contains blocks used. […]